|
Click on the photos for larger
views.
Click "Back" on your browser to return.
|
 |
|
 |
Frost Bank
33-story bulding with steel and glass crown |
 |
|
Landry's
Aquarium Restaurant
Downtown Houston restaurant includes a spiral staircase that wraps around
a 50-foot-high, 100,000-gallon aquarium
|
 |
|
Redstone Office Building
|
 |
|
 |
Texas
State History Museum
|
 |
|
St. Luke's Episcopal
Hospital Complex
Six-story medical office facility,
one of five buildings
2,200 tons of steel delivered
on schedule
|
 |
|
 |
Lucent Technology
"Moongate"
during construction and completed |
 |
|
Jacobs Engineering
1,350 tons of steel utilized
|
 |
|
Edwards 24-plex Theater
|
 |
|
 |
|
5 Houston Center
27-story office facility with no jobsite storage capacity
Skybridge to Chevron Tower (right), stairs and handrails, embeds,
and miscellaneous steel provided by Myrex Industries
|

|
|
Family Dollar
Distribution Center
Covers 950,000 sq. ft. - 21 acres under roof
|
 |
|
Air Traffic Control
Tower
Beaumont, Texas Airport
|
 |
|
 |
University of Houston
Wellness Center
2,100 tons of
complex steel, detailed and fabricated on the tightest of schedules
120 x 22 ft. trusses
over pool and basketball courts
|
 |
|
Pontoons
For floating
dock
for cruise ship,
Port of Houston |
 |
|

|
Memorial High School
Rolled
stair and pipe framing installed on location
|
 |
|
Stairs with landing
and handrails
|
|
top |
For questions, comments or additional information, please contact
us at jmoffa@myrex.com.

9119 Weedy Lane
Houston, TX 77093
(713) 691-5200
Fax (713) 691-3355 |