|
 |
|
Glomar Explorer
2,000,000-lb. hook capacity derrick
|
|
 |
|
Mast on Triple Box Substructure
Fabricated in Myrex facility
|
|
 |
|
Crane Base
Fabricated
for a 125-ton crane on a derrick off the coast of Trinidad
|
|
 |
|
Fabrication of
Derrick Leg
|
|
 |
|
 |
|
Shaker Mud Tanks
Detailed and fabricated in 5 weeks
|
|
 |
|
Crane Booms
Fabricated from special
cold weather steel
|
|
 |
|
Cold Start Unit Package
Skid
and chain guard designed
and fabricated by Myrex
|
|
 |
|
Line Guard
For oilfield application
|
 |
|
Water Table
Beams
|
|
 |
|
 |
|
Assembly of Hydraulic Substructure |
|
 |
|
Riser Handling System
Designed, fabricated and rigged up to suit
transocean requirements
|
|
 |
|
Bell Nipple
Painted
and ready for delivery
|
|
 |
|
Plate Girders
Fabricated
from API 2H plate and shipped to Nigeria for a production platform
|
|
 |
|
Widow Maker
Ready
for shipment to our painter
|
|
 |
|
Crane Gantry
Manufactured with cold weather steel |
top |
For questions, comments or additional information, please contact
us at jmoffa@myrex.com.

9119 Weedy Lane
Houston, TX 77093
(713) 691-5200
Fax (713) 691-3355 |